There are approximately 440 nuclear power units in operation worldwide, with the vast majority (about 92%) being light water reactors (LWRs), while the rest are pressurized heavy water reactors (PHWRs) and advanced gas-cooled reactors (AGRs), among others. Light water reactors mainly consist of two types: pressurized water reactors (PWRs) and boiling water reactors (BWRs), with PWRs accounting for about 75%. The overwhelming majority of nuclear power plants currently in operation and planned for construction in China are of the PWR type.
Since the advent of nuclear power plants, three industrially mature reactor types have emerged as the mainstay of modern nuclear power generation: light water reactors, heavy water reactors, and graphite-moderated gas-cooled reactors. These are respectively used in three different types of nuclear power plants, forming the backbone of contemporary nuclear electricity generation. The majority of thermal neutron reactors utilize light water for both moderation and cooling, hence the term light water reactors (LWRs). LWRs are further divided into pressurized water reactors (PWRs) and boiling water reactors (BWRs).
A PWR nuclear power plant uses light water as both coolant and moderator. It primarily consists of the nuclear steam supply system (i.e., the primary loop system), the turbine-generator system (i.e., the secondary loop system), and other auxiliary systems. After absorbing the thermal energy released by nuclear fission in the reactor core, the coolant transfers heat to the secondary loop through steam generators to produce steam, which then drives the turbine to generate electricity.
| Project Portfolio in Pressurized Water Reactor (PWR) | |||||
| Project/Program/Equipment | Nuclear Safety Class | Main Material | Quantity (set) | Customer | Project Start/End Date |
| China Advanced Research Reactor Decay Tank | 2 | 20R | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2005/2006 |
| China Advanced Research Reactor Diversion Tank | 3 | 0Cr18Ni10Ti | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2005/2006 |
| China Advanced Research Reactor Heavy Water Tank | 3 | 0Cr18Ni10Ti | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2005/2006 |
| Pakistan Chashma C2 Emergency Diesel Oil Storage Tank | 3 | 16MnHR | 3 | China National Nuclear Corporation Overseas Ltd. | 2006.5/2007.3 |
| Pakistan Chashma C2 Reactor Internals Basket Cylinder | LS | 321 | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2006.9/2007.9 |
| Lingao Phase II Unit 3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2006.12/2008.4 |
| Qinshan Phase II Expansion Unit 3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2006.9/2008.7 |
| Qinshan Nuclear Power Phase II Expansion Nuclear Sampling System (98 units of vessels/heat exchangers) | 3 | 00Cr19Ni10/00Cr17Ni14Mo2/20HR-B | 98 | Qinshan Nuclear Power Joint Venture Co., Ltd. | 2007.6/2009.5 |
| Hongyanhe Unit 1/2/3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 4 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2008.5/2012.2 |
| Ningde Unit 1/2/3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 4 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2008.5/2012.6 |
| Yangjiang Unit 1/2/3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 4 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2009.8/2012.11 |
| Fuqing Unit 1/2/3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 4 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2009.9/2012.10 |
| Qinshan Fangjiashan Unit 1/2 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2009.9/2011.7 |
| Changjiang Unit 1/2 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2010.2/2012.10 |
| AP1000 Sanmen Unit 1/2, Haiyang Unit 1/2 Automatic Depressurization System (ADS) Sparger | 3 | TP316 | 16 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2011.3/2012.12 |
| Changjiang Unit 1/2, Yangjiang Unit 3/4 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder Head | 2 | Z2CN18-10 | 18 | Shenyang Blower Group Nuclear Power Pump Industry Co., Ltd. | 2012.3/2012.8 |
| Ningde Unit 3/4, Fangchenggang Unit 1/2 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder, Straight Pipe | 2 | Z2CN18-10 | 8 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2010.11/2012.12 |
| AP1000 Sanmen Unit 1/2, Haiyang Unit 1/2 In-Containment Refuelling Water Storage Tank (IRWST) Return Trough | 3 | 304 | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2011.7/2013.3 |
| Fangchenggang Unit 1/2 Waste Oil Storage Tank | NC | 06Cr19Ni10 | 3 | China Nuclear Power Engineering Co., Ltd. | 2013.6/2014.3 |
| Fuqing Unit 3/4 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder, Straight Pipe | 2 | Z2CN18-10 | 4 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2012.3/2014.3 |
| AP1000 Sanmen Unit 2/Haiyang Unit 2 Integrated Reactor Vessel Head Storage Rack MZ04 | NC | SA516 Gr.70 | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2012.3/2014.5 |
| Pakistan C3/C4 Diesel Generator Day Tank | 3 | 16MnHR | 5 | China National Nuclear Corporation Overseas Ltd. | 2011.11/2014.8 |
| Pakistan C3/C4 Project Pressurizer Relief Tank (2 units), Spent Fuel Cooler (4 units) | 3 | 16MnHR/00Cr19Ni10 | 6 | China National Nuclear Corporation Overseas Ltd. | 2012.4/2014.8 |
| Pakistan C3/C4 Reactor Internals Basket Cylinder | LS | 321 | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2013.9/2014.10 |
| AP1000 Sanmen Unit 2, Haiyang Unit 2 Reactor Internals Lifting Tool MZ02, Upper/Lower Reactor Internals Storage Rack MZ03/MZ05 | 3 | 304 | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2011.6/2015.6 |
| Yangjiang Unit 5/6 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2013.10/2015.10 |
| Yangjiang Unit 5/6 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder, Straight Pipe | 2 | Z2CN18-10 | 4 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2013.12/2015.12 |
| Haiyang Unit 3/4 Reactor Internals Basket Cylinder | LS | 304 | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2013.10/2016.5 |
| Hongyanhe Unit 5/6 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2014.7/2016.9 |
| Sanmen Unit 3/4 Reactor Internals Basket Cylinder, etc. | LS | 304 | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2015.3/2016.11 |
| Fuqing Unit 5/6 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2015.3/2016.10 |
| Pakistan Karachi K2/K3 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2015.3/2016.10 |
| Sanmen Unit 2, Haiyang Unit 2 Upper Internals Storage Rack Seismic Frame | NC | ASTM SA240 304 | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2016.3/2016.10 |
| Qinshan Phase III Heavy Water Storage Tank | 3 | 304 | 1 | China Institute of Atomic Energy | 2016.6/2017.3 |
| Fuqing Unit 5/6 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder, Straight Pipe | 2 | 022Cr19Ni10 | 4 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2015.12/2017.5 |
| CAP1400 SNPEC PWR Demonstration Project Unit 1 Accumulator | 3 | SA533 Gr.B CL.1/304L | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2013.01/2019.10 |
| Tianwan Unit 5/6 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2016.4/2017.10 |
| Hongyanhe Unit 5/6 Low Pressure Safety Injection Pump, Containment Spray Pump Head | 2 | Z2CN18-10 | 4 | Shanghai Apollo Machinery Co., Ltd. | 2017.3/2017.10 |
| Xudabao Unit 1/2 Neutron Shield Plate Rolling and Cutting | LS | 304L | 2 | Shanghai Electric Nuclear Power Equipment Co., Ltd. | 2017.10/2017.12 |
| Tianwan Unit 5/6 Containment Spray Pump, Low Pressure Safety Injection Pump Cylinder, Straight Pipe | 2 | 022Cr19Ni10 | 4 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2016.4/2017.12 |
| Fangchenggang Unit 3/4 Reactor Internals Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2017.1/2018.4 |
| Hongyanhe Unit 5/6 LOT130Na Nuclear Sampling and Other Systems (61 units of non-standard equipment/heat exchangers) | 3 | 00Cr19Ni10/20HR | 61 | China Nuclear Power Engineering Co., Ltd. | 2015.7/2018.4.20 |
| Tianwan Unit 5/6 DY Building Diesel Generator Main Oil Storage Tank Equipment | NC | Q345R | 2 | China Nuclear Power Engineering Co., Ltd. | 2017.4/2018.5 |
| CENTER Project Support Cylinder | SC | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2018.6/2018.10 |
| K-2/K-3 Project PRS Emergency Makeup Tank and Support Equipment | 2 | 18MND5 | 12 | China National Nuclear Corporation Overseas Ltd. | 2016.1/2018.11 |
| Hongyanhe Unit 5/6 LOT130Ae RPG Accumulator, ASP Chemical Additive Tank | NC | 20MnHR | 6 | China Nuclear Power Engineering Co., Ltd. | 2016.6/2018.12 |
| Fangchenggang Unit 3/4 LOT130Ag NI Fifth Batch of Embedded Vessels | 3 | Z2CN19-10 with Controlled Nitrogen | 20 | China Nuclear Power Engineering Co., Ltd. | 2016.9/2018.12 |
| Fangchenggang Unit 3/4 LOT130Ak High Temperature Sampling Cooler and Skimmer | 3 | 022Cr17Ni12Mo2 | 16 | China Nuclear Power Engineering Co., Ltd. | 2017.1/2019.1 |
| AP1000 Haiyang 3/4, Sanmen 3/4, Lufeng 1/2, CAP1400 SNPEC ADS Sparger, Water Tank Filter, etc. | 3 | TP316 | 16 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2014.9/2019.1 |
| Tianwan Unit 5/6 Main Equipment Matching Installation Special Tools | LS | 304 | 2 | China Nuclear Power Engineering Co., Ltd. | 2017.9/2019.6 |
| HPR1000 Fangchenggang Unit 3/4 LOT130Al Fuel Oil Center Storage Tank and Expansion Tank, SED Seal Water Tank | F-SC3 | 20HR | 7 | China Nuclear Power Engineering Co., Ltd. | 2017.6/2019.5 |
| HPR1000 Fangchenggang Unit 3/4 LOT130Af NI Second Batch of Heat Exchangers | 3 | 022Cr17Ni12Mo2 | 22 | China Nuclear Power Engineering Co., Ltd. | 2016.11/2019.5 |
| No. 2 Mock-up Test Facility | NC | Q390C | 1 | Nuclear Power Institute of China | 2019.10/2020.7 |
| R Project Spent Fuel Assembly Gripper and Hanger | RS | 00Cr17Ni12Mo2 | 6 | China Nuclear Power Engineering Co., Ltd. | 2019.10/2020.6 |
| Steam Generator Mock-up | NC | 690 | 1 | Nuclear Power Institute of China | 2020.6/2020.10 |
| CGNRC Scaled Model Test Vessel | NC | 16MnIII/SA508 Gr.3 | 1 | Suzhou SSTGB Environmental Reliability Laboratory Co., Ltd. | 2019.10/2021.3 |
| Taipingling Unit 2 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2019.11/2021.4 |
| SNPEC CAP1400 PWR Demonstration Project Unit 1, 2 Reactor Internals Lifting Tool MZ02, Upper/Lower Reactor Internals Storage Rack MZ03/05, Integrated Reactor Vessel Head Assembly Storage Rack MZ04 | 3 | 06Cr18Ni11Ti/ 022Cr19Ni10/Q275B | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2015.12/2022.5 |
| CAP1400 Demonstration Unit 1, 2 MT73 In-Containment Refuelling Water Storage Tank (IRWST) Return Trough | 3 | 304 | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2017.7/2022.9 |
| SNPEC CAP1400 Demonstration Unit 1, 2 PXS pH Adjustment Basket | 3 | 304 | 10 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2016.2/2021.6 |
| CNNC 404 Project Decommissioning Governance Safety Class and Non-Safety Class Diesel Generator Set Main Fuel Oil Storage Tank | RC | P265GH、Q245R | 4 | Hudong Heavy Machinery Co., Ltd. | 2021.5/2021.8 |
| Daya Bay Base Additional Diesel Engine Project LOT130Aa (Tanks/Vessels) | 3 | 022Cr19Ni10/20HR | 24 | Shenzhen China General Nuclear Power Engineering Design Co., Ltd. | 2020.1/2021.9 |
| Tianwan Unit 5, 6 Sampling Heat Exchanger | 3 | 321 | 8 | Jiangsu Nuclear Power Corporation Limited | 2019.4/2021.12 |
| Taishan Unit 1/2 REN Primary Side High Temperature Sampling Cooler | 3 | Z2CND17-12 | 2 | China Nuclear Power Engineering Co., Ltd. | 2021.1/2021.12 |
| CNNC 404 Project Decommissioning Governance Safety Class and Non-Safety Class Diesel Generator Set Tank Equipment | RC | P295GH、Z6CN18.10 | 28 | Hudong Heavy Machinery Co., Ltd. | 2021.6/2022.6 |
| Sanao Unit 1/2 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2020.10/2022.8 |
| Ningde Unit 5 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2021.5/2022.8 |
| CNNC 404 Z Project Phase II Shear Machine, Feed/Discharge Machine, etc. | NR(S) | 06Cr18Ni11Ti | 1 | Shanghai Electric Nuclear Power Group Co.,Ltd. | 2021.9/2022.8 |
| Pressurizer, Steam Superheater Vessel, Test Vessel | NC | Stainless steel | 7 | Nuclear Power Institute of China | 2019.12/2022.11 |
| SGSJ Steam Generator Mock-up | NC | S32168, Inconel 690 | 1 | Nuclear Power Institute of China | 2020.6/2020.11 |
| HPR1000 Taipingling Unit 1, 2 LOT130Ae Emergency Diesel Engine Main Storage Tank, SBO Diesel Engine Main Storage Tank | 3 | P265GH | 10 | China Nuclear Power Engineering Co., Ltd. | 2019.5/2022.11 |
| IMP-CAS Accelerator Driven Transmutation Research Device Reactor Internals | NC | S30408 | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2022.7/2023.4 |
| Lufeng Unit 5/6 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2022.1/2023.6 |
| HPR1000 Taipingling Unit 1, 2 LOT130Ad NI Third Batch of Vessels | 3 | Z2CN19-10( with Controlled Nitrogen)/P265GH /022Cr17Ni12Mo2 /022Cr19Ni10 | 85 | China Nuclear Power Engineering Co., Ltd. | 2020.3/2023.10 |
| Xudabao Unit 1/2 Half-Ring Plate Machining | LS | SA 240 304 | 24 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2023.5/2023.11 |
| Taishan REN Sampling Heat Exchanger | 3 | Z2CND17-12 | 2 | Taishan Nuclear Power Joint Venture Co., Ltd. | 2022.6/2024.4 |
| AP1000 Haiyang Unit 3/4 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2011.5/2024.5 |
| Hainan Changjiang Multi-Purpose Small Reactor SMR Technology Demonstration Project NI Vessels (Fourth Batch) | 3 | Stainless steel | 3 | China Nuclear Power Engineering Co., Ltd. | 2022.6/2024.8 |
| Taipingling Unit 3 Reactor Internals Basket Cylinder, etc. | LS | Z2CN19-10 with Controlled Nitrogen | 1 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2022.7/2024.10 |
| Qinshan HWR QHWD Heavy Water Distillation Project Storage Tanks, Separation Tanks and Heat Exchange Equipment, etc. | 3 | Stainless steel / Carbon Steel | 28 | China Nuclear Power Engineering Co., Ltd. | 2022.9/2024.10 |
| Changjiang Unit 3/4 Main Equipment Matching Installation Special Tools | 3 | Stainless steel | 26 | China Nuclear Power Engineering Co., Ltd. | 2022.3/2024.10 |
| Tianwan Unit 7,8, Xudabao Unit 3,4 NI Vessels Third Batch | 3 | Stainless steel / Carbon Steel | 24 | China Nuclear Power Engineering Co., Ltd. | 2021.5/2024.11 |
| Nuclear Energy Development Project Transport Container LOT608A | NC | Stainless steel / Carbon Steel | 6 | China Nuclear Industry Huaxing Construction Co., Ltd. | 2022.3/2024.6 |
| Changjiang Unit 3/4 Main Equipment Matching Installation Special Tools | 3 | Stainless steel | 26 | China Nuclear Power Engineering Co., Ltd. | 2022.3/2024.7 |
| Lianjiang Unit 1/2 Accumulator | 3 | SA533 Gr.B CL.1/304L | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2021.9/2024.12 |
| Lianjiang Unit 1/2 Reactor Internals Basket Cylinder, etc. | LS | SA 240 304 | 2 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2022.7/2024.8 |
| SNPEC AP1000 Haiyang 3/4, Lufeng 1/2, Sanmen 3/4 PXS pH Adjustment Basket | 3 | 304 | 40 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2016.2/2025.10 |
| Sanmen 3/4, Haiyang 3/4, Lufeng 1/2 MT73 In-Containment Refuelling Water Storage Tank (IRWST) Return Trough | 3 | 304 | 7 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2017.7/2025.12 |
| AP1000 Bailong Unit 1/2 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2018.4/2025.12 |
| HPR1000 Ningde Unit 5,6 LOT130Ab NI Second Batch of Embedded Vessels | 3 | 304L | 59 | China Nuclear Power Engineering Co., Ltd. | 2018.5/2025.6 |
| Fangchenggang BT Project Unit 6 LOT130Ab NI Second Batch of Embedded Vessels | 3 | Stainless steel / Carbon Steel | 23 | China Nuclear Power Engineering Co., Ltd. | 2022.10/2025.11 |
| Sanmen Unit 5/6 NI Vessels (First Batch) | 3 | Stainless steel / Carbon Steel | 56 | China Nuclear Power Engineering Co., Ltd. | 2022.7/2025.4 |
| Zhangzhou 3,4, Sanmen 5,6, Jindian 1,2 Emergency Diesel Engine Fuel Oil Storage Tank | 3 | Q265HR | 12 | China Nuclear Power Engineering Co., Ltd. | 2023.3/2026.8 |
| Ningde Unit 5,6 LOT130Ae Diesel Engine Main Storage Tank | 3 | 20HR | 10 | China Nuclear Power Engineering Co., Ltd. | 2023.5/2025.11 |
| Cangnan Sanao Unit 3,4 LOT130Ae Diesel Engine Main Storage Tank | 3 | 20HR | 4 | China Nuclear Power Engineering Co., Ltd. | 2023.11/2025.4 |
| Cangnan Sanao Unit 1,2 LOT130Ag Emergency Diesel Generator Set (Standby) Main Storage Tank | 3 | 20HR | 1 | China Nuclear Power Engineering Co., Ltd. | 2023.11/2024.12 |
| Tianhong Project BB01 Delay Tank, BV10 Pressurizer | 2 | 316L | 2 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2023.11/2025.9 |
| HPR1000 (Fangchenggang 5,6 + Zhaoyuan 1,2 + Ningde 5,6) + ACP1000 (Jindian 1,2 + C5) Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen | 9 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2023.11/项目需求 |
| Haiyang Unit 5,6 Sparger (MW01), Cooling Water Tank Filter (MY02), Downcomer Filter (MY0G) | 3 | 316 | 30 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2028.5 |
| Bailong Unit 1,2 Sparger (MW01), Cooling Water Tank Filter (MY02), Downcomer Filter (MY0G) | 3 | 316 | 30 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2028.2 |
| Laiyang Unit 1,2 MT02 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2027.4 |
| Lianjiang Unit 3,4 MT02 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2027.6 |
| Bailong Unit 3,4 MT02 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2028.6 |
| Laiyang Unit 3,4 MT02 Accumulator | 3 | SA533 Gr.B CL.1/304L | 4 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.1/2029.6 |
| Cangnan Sanao Unit 3,4 LOT130Ae Additional Main Storage Tank and SBO Diesel Storage Tank | 3 | 20HR | 4 | China Nuclear Power Engineering Co., Ltd. | 2024.6/2026.7.31 |
| Tianhong Project Primary Circuit Main Heat Exchanger (AC01), Irradiation Loop Regenerative Heat Exchanger (AC10), Irradiation Loop Non-Regenerative Heat Exchanger (AC11) | 2 | 316 | 6 | Shanghai Nuclear Engineering Research & Design Institute Co., Ltd. | 2024.7/2026.3 |
| Taipingling Unit 3,4 LOT130G NI Evaporator and Degasser | 3 | 022Cr17Ni12Mo2 | 12 | China Nuclear Power Engineering Co., Ltd. | 2024.8/2027.10 |
| Sanmen Unit 5,6 Reactor Coolant Pump Motor Stand | 1 | SA-508 Gr.3 CL1,SA-516 Gr.70 CL1 | 6 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2024.11/2026.6 |
| Zhaoyuan Unit 1,2 Reactor Coolant Pump Motor Stand | 1 | SA-508 Gr.3 CL1,SA-516 Gr.70 CL1 | 6 | Shanghai Electric KSB Nuclear Power Pump & Valve Co., Ltd. | 2024.11/2026.9 |
| Zhaoyuan Unit 1,2 LOT44Ag Conventional Island Header and Sleeve | NC | A355P22,WB36CN1,Q345R | 46 | China Nuclear Power Engineering Co., Ltd. | 2025.1/2029.4 |
| Haiyang 5,6 + Laiyang 3,4 + Lianjiang 3,4,5,6 + Xinan 1,2 Basket Cylinder | LS | Z2CN19-10 with Controlled Nitrogen/304LN | 10 | Shanghai No.1 Machine Tool Works Co., Ltd. | 2025.4/2026.12 |
| Fangchenggang Unit 5,6 LOT130Af ASP Condenser and Reactor Cavity Seal Ring Equipment | 3 | Z2CN18-10/Z2CN18-12( with Controlled Nitrogen)/022Cr19Ni10 | 8 | China Nuclear Power Engineering Co., Ltd. | 2025.7/2029.11 |